The Project Schedule identifies future planning efforts, joint funding initiatives, design, and construction projects that AMAFCA hopes to accomplish over the next six fiscal years (FYs; July 1 to June 30 of each year). The projects selected for the FY 2025 Project Schedule were derived from an extensive review and analysis of approximately 400 different planned flood control and water quality projects within AMAFCA’s jurisdiction. Each project was evaluated by assessing current and future needs and regulatory priorities.
All of the projects identified strive to improve and protect stormwater quality. Projects in the FY 2025 Project Schedule were prioritized (as required by AMAFCA’s Municipal Separate Storm Sewer System permit) relative to other stormwater quality facilities based on cost, existing Best Management Practices within the subbasin (effectiveness), and proximity to the Rio Grande.