The West Branch of the Calabacillas Arroyo flows through the CNM westside campus.

To provide channel stability through the campus, a series of grade control structures will be constructed.  These structures will provide stability to the arroyo and protect buildings and other facilities on the CNM campus.

Calabacillas West Branch Construction Photo 12/2022

[December 2022]

Calabacillas West Branch Construction Photo _December 2022

[December 2022]

Calabacillas West Branch GCS Preconstruction photo

[May 2022]

Calabacillas West Branch Construction photo_October 2022

[October 2022]