The West Branch of the Calabacillas Arroyo flows through the CNM westside campus.
To provide channel stability through the campus, a series of grade control structures will be constructed. These structures will provide stability to the arroyo and protect buildings and other facilities on the CNM campus.

[December 2022]

[December 2022]

[May 2022]

[October 2022]
[Updated 1/24/2023]