Sediment accumulates in the AMAFCA flood control infrastructure that decreases the performance of the facilities and their ability to provide flood conveyance. To facilitate the removal that accumulation and restore functionality, AMAFCA will begin a sediment removal project with the first location occurring at the Tijeras Sediment Retention Structure.
[Updated 5/5/2025]