The West Branch Calabacillas Grade Control Structure 11 is currently under construction adjacent to the CNM Westside Campus. Please contact
Valle de Oro Barr Improvements Project
[Updated November 2022] AMAFCA is poised to start the last phase of construction of the Valle de Oro Drainage
Valle de Oro Swale Project (Complete)
[Updated October 2022] AMAFCA is poised to substantially complete this phase of construction of the Valle de Oro Drainage
Black Mesa 3 Dam Outlet – Phase V (Complete)
[Updated April 2021] The “Three Dam Outlet Pipe Project” was conceived in 2003 to provide an outlet for Don Felipe
Valle de Oro Outlet Structure (Complete)
[Updated December 2020] AMAFCA has substanitally completed the first phase of construction of the Valle de Oro Drainage Facility. The
Black Mesa 3 Dam Outlet – Phase III & Phase IV (Complete)
[Updated June 2020] The “Three Dam Outlet Pipe Project” was conceived in 2003 to provide an outlet for Don Felipe
Lower Bear Tributary Arroyo Regional Water Quality Facility
January 11, 2021 – AMAFCA and the City of Albuquerque are excited to be nearing the end of construction
Black Mesa 3 Dam Outlet Raymac Dam to Don Felipe Dam Project Phase II (Complete)
UPDATE: The project is substantially complete. As of March 20th, irrigation water was flowing in the Gun Club Lateral through
Louisiana-Gibson Regional Drainage Facility (Complete)
The Louisiana-Gibson Regional Drainage Facility will be built at the southeast corner of Louisiana Blvd and Gibson Blvd. Construction started
Calabacillas Arroyo GCS 1a1 (Complete)
When development started on the northwest side of Albuquerque, it was decided that the Calabacillas Arroyo would be maintained in