Construction on the Valle de Oro Barr Improvements Project is substantially complete as of April 2023.
The Valle de Oro Barr Improvements Project includes a shotcrete water quality structure, reconstruction of the Barr Spur channel, construction of a 10ft x 7ft and 8ft x 6ft concrete box culverts for the Barr Spur and Barr Interior Drain, respectively, and relocation of a water transmission pipeline.
Conceptual renderings of the Barr Improvements Project at the Barr Spur and Barr Interior Drain and water quality structure.
Photos taken April 2023.